Reducing the maintenance and reinforcement costs for tunnel lining |
|
Not subject to ground condition, such as soft ground and solid foundation as a product with high solidity,
450MPa - 600MPa |
|
Reducing the time length of construction of tunnel through rapid construction/Improving construction speed by
5 - 6 times better compared to existing onsite joint method |
|
Improving quality and durability tremendously/Reducing cracking and Increasing the life span of lining. |